Black Rock WWTP Upgrade

Barwon Water Corporation  ·  $3.6M Civil Works

Upgrade of incoming sewer mains and structures within the existing treatment plant to improve flows and system reliability.

Click a marker to explore each work area

Black Rock WWTP Upgrade aerial overview
Diversion Pit Structure

Diversion Pit Structure

To improve system reliability and create additional capacity within the existing 1650mm diameter Geelong Main Outfall Sewer, the base of a 4m diameter, 4m deep diversion chamber was demolished and rebuilt — removing a redundant internal weir structure and providing a new 1m diameter inlet for the coastal sewers.

Tee Removal

Tee Removal

Abandonment of the old oxygen dissolver system required removal of a mild steel tee, replacement, and bandaging of a new 1650mm diameter pipe. Across the plant, new works required on-site welding to connect to the existing PVC corrosion protection liner.

Bypass Pumping

Bypass Pumping

Works occurred within a planned plant shutdown, requiring bypass pumping of over 2,000 L/s of sewer flows from multiple sources including the Geelong Main Outfall, Torquay and Barwon Heads outfalls, and various internal plant lines.